Jesus of Cool, I'm bad, I'm nationwide
For those of us old enough to remember, November 9th, 1965 was the worst power blackout in US history. My father was stuck in an elevator at 30 Rockefeller Center for a few hours while we waited for him in the dark of our apartment building near Washington Square. Looking out our 15th floor window to see New York City in total and complete blackness is something I'll never forget. Although parts of Brooklyn never lost power and others regained it early that evening all you could see was a glow in that direction, Manhattan was dark as midnight except for the headlights of the cars.
(the Wiki on it)
The cause of the failure was human error that happened days before the blackout, when maintenance personnel incorrectly set a protective relay on one of the transmission lines between the Niagara generating station Sir Adam Beck Station No. 2 in Queenston, Ontario and Southern Ontario. Instead of the relay being set to trip and protect the line if the flow of power exceeded the line's capacity, it was set for a much lower value.
As was common on a cold November evening, power for heating, lighting and cooking was pushing the electrical system to near its peak capacity, and the transmission lines heading into Southern Ontario were heavily loaded. At 5:16 p.m. Eastern Time a small surge of power coming from Lewiston, New York's Robert Moses generating plant caused the misset relay to trip at far below the line's rated capacity, disabling a main power line heading into Southern Ontario. Within seconds, the power that was flowing on the tripped line transferred to the other lines, causing them to become overloaded. Their protective relays, which are designed to protect the line if it became overloaded, tripped, isolating Adam Beck from all of Southern Ontario.
With no place else to go, the excess power from Beck then switched direction and headed east over the interconnected lines into New York State, overloading them as well and isolating the power generated in the Niagara region from the rest of the interconnected grid. The Beck and Moses generators, with no outlet for their power, were automatically shut down to prevent damage. Within five minutes the power distribution system in the northeast was in chaos as the effects of overloads and loss of generating capacity cascaded through the network, breaking it up into "islands". Plant after plant experienced load imbalances and automatically shut down. The affected power areas were the Ontario Hydro System, St Lawrence-Oswego, Western New York and Eastern New York-New England. Maine, with only limited electrical connection southwards, was not affected.
(the Wiki on it)
The cause of the failure was human error that happened days before the blackout, when maintenance personnel incorrectly set a protective relay on one of the transmission lines between the Niagara generating station Sir Adam Beck Station No. 2 in Queenston, Ontario and Southern Ontario. Instead of the relay being set to trip and protect the line if the flow of power exceeded the line's capacity, it was set for a much lower value.
As was common on a cold November evening, power for heating, lighting and cooking was pushing the electrical system to near its peak capacity, and the transmission lines heading into Southern Ontario were heavily loaded. At 5:16 p.m. Eastern Time a small surge of power coming from Lewiston, New York's Robert Moses generating plant caused the misset relay to trip at far below the line's rated capacity, disabling a main power line heading into Southern Ontario. Within seconds, the power that was flowing on the tripped line transferred to the other lines, causing them to become overloaded. Their protective relays, which are designed to protect the line if it became overloaded, tripped, isolating Adam Beck from all of Southern Ontario.
With no place else to go, the excess power from Beck then switched direction and headed east over the interconnected lines into New York State, overloading them as well and isolating the power generated in the Niagara region from the rest of the interconnected grid. The Beck and Moses generators, with no outlet for their power, were automatically shut down to prevent damage. Within five minutes the power distribution system in the northeast was in chaos as the effects of overloads and loss of generating capacity cascaded through the network, breaking it up into "islands". Plant after plant experienced load imbalances and automatically shut down. The affected power areas were the Ontario Hydro System, St Lawrence-Oswego, Western New York and Eastern New York-New England. Maine, with only limited electrical connection southwards, was not affected.