Same here, most of mine are within the insulation.
The problem lies in the Perlick's absorbing heat from the garage, and storing that heat through the shank.
Then with the first pour of the day, I have about 1/3rd foam. 2nd pour is perfect if poured within 20 mins or so. If the next pour is...